| Scope
of Work: Task 3 Integration of Fractured
Reservoir Data and Production Technologies The
purpose of Task 3 is to integrate all of the
fundamental research, new characterization
methods and field data into a software package
capable of reproducing the fracture parameters of
interest in a fractured reservoir. Task 3 will
include creation of a new 3D discrete fractured
reservoir simulation tool; and development of an
interface between this code and standard
reservoir simulation tools.
- Task 3.1:
Linkage to Stratigraphic Reservoir Models
- Task 3.2:
Integrated Fractured Reservoir Discrete
Fracture Model
|